What was our process for fitting this new flooring in our client’s utility room?

Laid down a layer of screed to level out the surface and bring up the height.

Packed out and tiled over the concrete stairs with our client’s new choice of tiles.

When levelling out a space one of the biggest challenges is simply waiting for the leveller to dry before doing any further work! It’s time consuming but the end result speaks for itself!